The project started on January 29. After the removal of the car port, the excavation started. The ground was prepared and the lines with yellow paint were showing the boundary of the building (picture taken on Feb. 9).
On Feb. 12, the trench was dug around the perimeter of the building. This is not a conventional foundation method around here but more efficient.
On Feb. 13, finally, concrete was poured in the trench along with some steel. The floor also showed the steel enforcement on the ground.
On Valentine's Day, the floor and the outside got concrete as well.
No comments:
Post a Comment